Before and After

Our Projects

2019

2020

2022

PCI 38 Road

2019

Road after PressurePave

2022

PCI 38 Road with milled cross walk in 2019

2019

Road After PressurePave With painted crosswalk in 2021

2022

PCI 38 Road with large cracks in 2019

2019

Road after PressurePave in 2021

2022

Poor condition Road in 2019

2019

Road with double solid yellow stripe in 2021

2022

PCI 38 Road with large cracks in 2019

Before

Road after PressurePave in 2021

After 2 Years

The projects are paved, using our innovative technology, PressurePave®.
Take a look at our strong track record of previous projects.

Case Studies Learn More